Cleaning
What this is
Cleaning and preparing the train for the next night of service, at a daily rate per coach over the operating days in a year.
Charged per coach, so a longer train costs proportionally more to turn around.
Cleaning and preparing the train for each night of service.
The formula
| Symbol | Meaning | Unit | Where it comes from | |
|---|---|---|---|---|
| Input | c_clean/day | Cleaning and preparation rate per coach and day | €/coach/day | composition_type_cleaning_eur_day |
| Input | n | Coaches needed for the service | coaches | computed upstream |
| Input | d_op | Operating days per year | days/year | computed upstream |
| Result | C_clean | Annual cleaning cost | €/year | — |
Feeds into: operator_fixed_total_eur
Found a mistake?
This documentation describes a model that is still being built, and some of it will be wrong. If a number looks off, a source is missing, or an explanation does not hold up, tell us — it reaches the working group with the page you were reading.
