Total cost
What this is
Everything running the route costs in a year: what the operator spends on staff, rolling stock and service, plus what it pays the infrastructure companies for track, electricity, stations and parking.
The route's total annual cost: operator plus infrastructure.
The formula
| Symbol | Meaning | Unit | Where it comes from | |
|---|---|---|---|---|
| Input | C_operator | All operator costs, fixed and variable | €/year | operator_total_eur |
| Input | C_infrastructure | All charges paid to infrastructure companies | €/year | infrastructure_total_eur |
| Result | C_total | Total annual cost | €/year | — |
Feeds into: net_eur
Found a mistake?
This documentation describes a model that is still being built, and some of it will be wrong. If a number looks off, a source is missing, or an explanation does not hold up, tell us — it reaches the working group with the page you were reading.
