Skip to content

Variable operator cost ​

What this is ​

The operator costs that move with how much the train actually runs: hours on duty, kilometres driven, tickets sold.

Add a stop and these grow. Run the service on fewer nights and they shrink. They are the costs that respond to the timetable.

The operator costs that scale with how much the train runs.

The formula ​

Cop,var=Cdriver+Ccrew+Ccoach,maint+Cloco+Csvc+Cvar,ohC_{op,var} = C_{driver} + C_{crew} + C_{coach,maint} + C_{loco} + C_{svc} + C_{var,oh}

SymbolMeaningUnitWhere it comes from
InputC_driverDriver cost€/yeardriver_eur
InputC_crewCabin crew cost€/yearcrew_eur
InputC_coach,maintCoach maintenance cost€/yearcoach_maintenance_eur
InputC_locoLocomotive rental cost€/yearloco_eur
InputC_svcOnboard service cost€/yearsvc_stockings_eur
InputC_var,ohVariable overhead€/yearvar_overhead_eur
ResultC_op,varTotal variable operator cost€/year—

Feeds into: operator_total_eur

Published by Back-on-Track. Every number on this site is generated from the model that produces the tool’s results. Text, figures and charts: CC BY 4.0 · code: GPL-3.0-or-later · map data © OpenStreetMap contributors.